CS ROOF PANEL - The details shown below are typical Chief metal building details. Not all details may apply. Specific details for additional features will be provided for complete installation instructions.

5

1/4-14 X 7/8" WT (1-1/2" C.C.)

ROOF JACK

1

CS ROOF PANEL

1/4-14 X 1 1/4" WT (6" C.C.) (TYP.)

3

1/4-14 X 7/8" (18" C.C.) (TYP.)

TAPE MASTIC AT PANEL LAP

1/4-14 X 1 1/4" WT (6" C.C.)

CS ROOF PANEL

FASTENER ORDER

3" (TYP.)

PIGTAIL TAPE MASTIC (Install a "Pig Tail" down the bearing leg of panel to form a continuous line of tape mastic with panel lap and closure.)

PANEL TO EAVE STRUT

1/4-14 X 7/8" WT (12" C.C.)

CS INSIDE CLOSURE

1/4-14 X 7/8" WT (12" C.C. FOR FIRST 6' FROM EAVE, REMAINDER AT 18" C.C.)

2"

TAPE MASTIC ON TOP OF CLOSURE

TAPE MASTIC

WALL PANEL

OVERLAPPING ROOF PANEL

UNDER-LAPPING ROOF PANEL

DOUBLE BEAD TAPE MASTIC UNDERSIDE OF ROOF JACK PIPE FLASHING FLANGE

EAVE TRIM (ETA)

PURLIN

TAPE MASTIC ON BOTTOM OF CLOSURE

Roof Jack Installation when Supplied By Chief 1. Cut a neat hole in roof panel with minimum clearance for pipe and install pipe. 2. Cut pliable Roof Jack using sharp pair of scissors, avoiding nicks. Hole should be 1/2" to 2" smaller than diameter of pipe to be flashed. 3. Drill 3/16" diameter holes at approximately 1-1/2" C.C. around base of Roof Jack. 4. Apply Double Bead Tape Mastic to underside of Roof Jack. Then using water as a lubricant, slide it onto the pipe until it meets panel. 5. Press Roof Jack base into contours of panel. A blunt tool can be used to press flanges into place at sharp angles. 6. Begin fastening Roof Jack progressively to roof panel with 1/4-14x7/8" WT at opposite sides, using predrilled holes as a template. 7. Install Stainless Steel Clamp around top of Roof Jack to secure it to the pipe (Not By Chief). General Notes: · In Northern Climates, the pipe penetration should be protected from moving ice or snow with a snow retention system (Not By Chief). Roof Jacks Not Supplied By Chief · Do Not Use Galvanized Roof Jacks, Lead Hats, or other residential grade Roof Jacks. These Roof Jacks do not have a 20 year service life and in case of Lead Hats will cause Galvanic Corrosion of the roof panel. · Use EPDM rubber Roof Jacks with an integral aluminum band bonded into the perimeter of the base. EPDM Roof Jacks have a temperature range from -65°F to 212°F. Use Silicon Roof Jacks for high temperatures. Silicone Roof Jacks have a temperature range of -100°F to 437°F. · Do not use Tube Sealant to seal the Roof Jack to the panels. Use roll tape sealer (Not By Chief) between the Roof Jack and the roof panel and attach the Roof Jack to the roof panel with 1/4-14x7/8 long life fasteners (Not By Chief) 1-1/2" C.C. around the base of the Roof Jack.

EAVE MEMBER

UNDER-LAPPING ROOF PANEL PURLIN BEARING LEG

TRIM CAP (TC)

CS INSIDE CLOSURE

PIGTAIL TAPE MASTIC INSTALLATION WITH EAVE TRIM

PANEL SIDELAP

2" LAP

UPPER SLOPE GABLE TRIM

GABLE TRIM

EAVE TRIM

LOWER SLOPE GABLE TRIM

(19) 1/8" X 3/8" BLIND RIVETS

GABLE TRIM PLUG

CS ROOF PANEL

(9) 1/8" X 3/8" BLIND RIVETS

B L

2" LAP

3"

EAVE TRIM

2" LAP

NOTES: · Use 2" lap at splices and field cut 3/8" Lockform at splice. · Fasten splice with (12) 1/8" x 3/8" blind rivets. · Sealant at splice not shown. All sealant used is 511-SIKALASTOMER at gable trim, gable ridge trim, gable corner trim gutter, trim cap, eave trim and height change trim splices and trim plugs.

TRIM CAP

GABLE CORNER TRIM

(2) 1/8" X 3/8" BLIND RIVETS

NOTE: · For roof overhang see additional sections. · Start gable trim bottom leg 4" past building line. · Start eave trim 3" out from building line. · Field cut roof sheet at gable corner trim. · Sealant at plug and corner trim not shown.

NOTES: · Use 2" lap at splices and field cut 3/8" Lockform at splice. · 511-SIKALASTOMER sealant at splice not shown.