MVF MVP Roof Panel

MVF-MVP Gable Lead End Height Change w Cut Roof Panel-Thermal Spacer

* FIELD CUT BOTTOM OF WALL PANELS TO MATCH ROOF SLOPE. PROVIDE AIR GAP OF 1/4" MIN. AT BOTTOM OF PANEL TO AVOID CORROSION.

ROOF PANEL CUT BACK DIM. CLIP LOCATION FROM B

L

TAPE MASTIC HEIGHT CHANGE TRIM BOTTOM (GHVB) HEIGHT CHANGE TRIM TOP (GHVT)

BL

2 1 4 "

*WALL PANEL INSIDE CLOSURE #12-14 X 1 1/4

1 1 2 "

DOUBLE BEAD TAPE MASTIC 1/4-14 X 1 1/4" WT (12" C.C.)** (2) #12-14 X 1 1/4" (EACH CLIP) WALL COLOR

(6" C.C.for CS PANEL) (12" C.C. for AP PANEL) RAKE ANGLE (A-20-L)

MVF/MVP ROOF PANEL RAKE ANGLE (A-20-B)

1

4 "

THERMAL SPACER

(NOT BY CHIEF)

PANEL CLIP

#12-14 X 1 1/4" (2 EACH PURLIN) (WALL COLOR)

DOUBLE BEAD TAPE MASTIC

PANEL CLIP w/FASTENERS (REFER TO ROOF PANELING PLAN)

PURLIN

(2) #12-14 X 1 1/4"

**NOTE: This fastener must not hit the purlin.

Made with FlippingBook - Online catalogs