Special Features

Eave Strut to Col w 10 Flange and MVF-MVP Roof Trans Exp wo Thermal Spacer

* FINGER TIGHTEN 1ST 1/2" DIA. NUT TO HARD WASHER, WRENCH TIGHTEN SECOND NUT TO FIRST NUT TO CREATE A SLIDING CONNECTION

1

** MAINTAIN 3 1/2" BETWEEN FIXED AND SLIDING EAVE STRUT DURING BUILDING ERECTION

CL

2 1 4 "

4 1 2 "

XBC-97

REF PT

SLIDING EAVE STRUT

SPECIAL PUNCH 9/16" HOLES AT 1 3/8" DIM A AND 4 1/4" GAGE IN BOTH EAVE STRUTS

1 1 4 "

1 3 8 " 4 1 4 "

* (2) 1/2" X 1 3/4" BOLTS w/ (2) NUTS AND (1) 1/2" HARD WASHER AT SLOT (BOLT MUST BE CENTERED IN SLOT) FRAME COLUMN EAVE HEIGHT

**3 1 2 "

3 1 4 "

(4) 1/2" X 1 1/4" BOLTS FIXED EAVE STRUT (4) 5/8" X 1 1/2" BOLTS w/ 5/8" HARD WASHERS AT C-SECTION SIDE

Made with FlippingBook flipbook maker