Long Span Joist to Rafter w 10 Flange Trans Exp
** FINGER TIGHTEN 1ST 3/4" DIA. NUT TO HARD WASHER, WRENCH TIGHTEN SECOND NUT TO FIRST NUT TO CREATE A SLIDING CONNECTION.
4" gage in rafter and joists for long span joists
1
* SLIDING JOIST FIXED JOIST RAFTER BEAM
4 1 2 "
** (2) 3/4" X ___ BOLTS w/ (2) NUTS AND (1) 3/4" DIA. HARD WASHER AT EACH SLOT (BOLTS MUST BE CENTERED IN SLOT * SLIDING JOIST (HAS 2 13/16" SLOTS)
CL
REF PT
1 1 4 "
(2) 3/4" X ___ BOLTS w/ 3/4" DIA. HARD WASHER AT SLOT SIDE
3.50
** (2) 3/4" X ___ BOLTS w/ (2) NUTS AND (1) 3/4" DIA. HARD WASHER AT EACH SLOT (BOLTS MUST BE CENTERED IN SLOT
7"
FIXED JOIST RAFTER BEAM
SLIDING SIDE
* ERECTOR NOTE: IT IS CRITICAL TO DOUBLE NUT AND CREATE THE SLIDING CONNECTION AT
ANGLE FLANGE BRACE NOT SHOWN (SEE CROSS SECTION FOR PIECE MARK, INSTALL ONLY ON FIXED JOIST SIDE)
(2) 3/4" X ___ BOLTS w/ 3/4" DIA. HARD WASHER AT SLOT SIDE
THE CORRECT SIDE. THE SLIDING JOISTS HAVE A LONGER 2 13/16" SLOT.
7"
1.50 min.
FIXED SIDE
SECTION
must be this long to support rake angle on fixed side
5"
3 1 4 " MIN.