Steel Framing Sections
1-1.Flange Brace
NOTE: · Field bend flange brace into place to align with holes in purlins/girts, as required. · Fill all holes in the flange brace with bolts. · If flange brace connection occurs within the purlin lap, install flange brace before tightening purlin bolts. · Flange brace may be one side only. For location and number of sides refer to Cross Sections, Endwall and Sidewall drawings.
BRACE DISTANCE
PURLIN/GIRT RAFTER/COLUMN
1/2" X 1 1/4" BOLTS
FLANGE BRACE (FB-x)
1/2" X 1 1/4" BOLTS (1/2" x 1 3/4" BOLTS AT 5/8" THICK FLANGE)
FLANGE BRACE "1-1 CONNECTION"
Made with FlippingBook - Online catalogs