MSC - Erection Manual
MSC
®
M echanically S eamed C onstruction
ERECTION SEQUENCE
THERMAL SPACER
STEP 4
RAKE SUPPORT
THERMAL SPACER (FOR HIGH SYSTEM ONLY)
PURLIN
Position the Thermal Spacer on top of the insulation over each purlin and against the rake support prior to installing the roof panel. The eave strut does not receive a Thermal Spacer.
EAVE STRUT
INSULATION
THERMAL SPACER
DOUBLE FACED TAPE (6" LONG PIECES AT 3'-0" C.C.) (BY INSULATION SUPPLIER)
THERMAL SPACER
SUBJECT TO CHANGE WITHOUT NOTICE
MSC-23
Version 7.2
Made with FlippingBook - Online magazine maker