STC - Erection Manual
STC S nap T ight C onstruction
®
ERECTION SEQUENCE
STEP 5
1
TRI-BEAD TAPE MASTIC
MINOR RIB TAPE MASTIC
FIRST PANEL Apply minor rib tape mastic to the underside of the minor ribs of the panel. Position so that this tape mastic will cross the Tri-Bead tape mastic at the eave strut when panel is installed. Position the panel so that it overhangs the eave strut by the dimension as shown on the erection drawings. The upper end of the panel must be 7" beyond the web of the endlap purlin. Using C-locking pliers, hold the panel against the inside closure. PREPUNCHED PANEL HOLES AT THE EAVE ARE INTENDED TO BE PART OF THE GUTTER OVERHANG AND WILL BE HIDDEN BY THE GUTTER. FOR A BUILDING WITH EAVE TRIM, THE PREPUNCHED HOLES WILL BE USED TO ATTACH THE EAVE TRIM TO THE PANEL.
7"
REFER TO ERECTION DRAWINGS
STEEL LINE
1/4"-14 X 1" (2) PER INSIDE CLOSURE
TRI-BEAD TAPE MASTIC
METAL INSIDE CLOSURE
TRI-BEAD TAPE MASTIC
TRIM CAP WALL PANEL
EAVE STRUT
INSULATION
Lay the female lip of the panel over the rake support. To prevent wind damage, secure the female lip to the rake support with C-locking pliers or temporary fasteners. Fasteners must go through rake support. The panel will not be fastened permanently to the rake support until the rake trim is installed.
STC-24
Version 7.1
SUBJECT TO CHANGE WITHOUT NOTICE