STC - Erection Manual

STC S nap T ight C onstruction

®

DETAILS

GABLE RIDGE TRIM FLOATING PEAK BOX

1. Install gable trim to 4” from center line of building each way.

4"

4"

GABLE TRIM

CENTER LINE OF BUILDING

GABLE TRIM

ROOF PANEL

OUTSIDE CLOSURE

TRI-BEAD MASTIC

GABLE TRIM

TRI-BEAD TAPE MASTIC (Marry the mastic from the gable trim and outside closure)

2. Place Tri-Bead Tape Mastic as shown.

STC-50

Version 7.1

SUBJECT TO CHANGE WITHOUT NOTICE

Made with FlippingBook - Online catalogs