Special Features

Eave Strut to Bypass Col w 6-8 flange Joist and MVF-MVP Roof Trans Exp w Thermal Spacer

* FINGER TIGHTEN 1ST 1/2" DIA. NUT TO HARD WASHER, WRENCH TIGHTEN SECOND NUT TO FIRST NUT TO CREATE A SLIDING CONNECTION

** MAINTAIN 2 1/2" BETWEEN FIXED AND SLIDING EAVE STRUT DURING BUILDING ERECTION SPECIAL PUNCH 9/16" HOLES AT 1 3/8" DIM A AND 4 1/4" GAGE IN BOTH EAVE STRUTS

1

1

FRAME COLUMN

CL

4 1 2 " 1 1 4 "

XBC-96

BL

XBC-96

(4) 1/2" X 1 1/4" BOLTS

REF PT

(4) 1/2" X 1 1/4" BOLTS

SLIDING EAVE STRUT

FRAME COLUMN

(4) 5/8" X 1 1/2" BOLTS w/ (4) 5/8" HARD WASHERS AT C-SECTION SIDE FIXED EAVE STRUT

1 1 4 "

1 3 8 " 4 1 4 "

NOTE: CONNECTION OF XBC-96 TO SLIDING EAVE STRUT IS NOT SHOWN IN THIS SECTION

EAVE HEIGHT

EAVE HEIGHT

* (2) 1/2" X 1 3/4" BOLTS w/ (2) NUTS AND (1) 1/2" HARD WASHER AT EACH SLOT (BOLT MUST BE CENTERED IN SLOT)

FIXED EAVE STRUT

3 1 4 "

**2 1 2 "

SECTION

(4) 5/8" X 1 1/2" BOLTS w/ 5/8" HARD WASHERS AT C-SECTION SIDE

Made with FlippingBook flipbook maker