Chief Buildings Details Guide V5.2
First page
Table of contents
Next page
Last page
Introduction
7
Section 2: General Information
8
2.01 Unloading Procedures
9
2.04 Purlin and Girt Punching
12
2.06 Welding Recommendations
14
Section 3 - Building Components / 3.01 Sealants
15
3.01 Sealants
15
3.02 Bolting Clips
16
3.07 Miscellaneous Components
21
Gable and Eave Trim
22
3.11 Corner and Opening Trim
25
3.12 Base Trim
26
3.13 Miscellaneous Trim
27
3.14 Roof Extension Trim
28
3.16 Slide Door Trim
30
Section 4: Framing Details
31
4.01 Eave Strut Connection
31
4.02 Purlins
32
4.03 Zee Purlin Connection
33
4.04 Bracing
34
4.06 Endwall Framing
36
4.08 Girts
38
4.11 Sag Angles
41
4.14 Rake and corner Angle
44
5 - Special Framing Details
45
5.01 Framed Openings
45
5.03 Boxed Headers
46
5.04 Brace Backs
48
5.06 Purlin Closures
50
6 - CS / AP Wall Panel Details
51
6.01 CS Wall Panel
51
6.03 AP Wall Panel
53
6.05 One Piece Base Angle
55
6.06 Overhead Doors and Windows W/ CS Panel
56
6.08 Walkdoors W/ CS Panel
58
6.09 Overhead Doors and Windows W/ AP Panel
59
6.10 Walkdoors W/AP Panel
61
6.12 Louver Installation
62
7 - Roof Paneling Details
65
7.01 CS Roof Panel
65
7.03 CS Gable and Eave Trim
67
7.05 CS Light Transmitting Panels
69
7.07 Dektite Roof Jacks
71
7.08 Ridge Vents
72
Made with
FlippingBook
flipbook maker