Chief Buildings Details Guide V5.2
comprehensive guide to common details
CHIEF BUILDINGS DETAILS GUIDE
ENDWALL RAFTER BEAM
EAVE STRUT
PURLIN
RIGID FRAME RAFTER
SIDEWALL GIRT
CORNER POST
RIGID FRAME COLUMN
HEADER
PERMANENT BUILDING BRACING
ENDWALL POST
OVERHEAD DOOR F.O.
DOOR JAMB
LEAN-TO RAFTER BEAM
ENDWALL GIRT
LEAN-TO FRAME COLUMN
WINDOW F.O.
DOOR JAMB
WALK DOOR F.O.
V 5.2
REVISED 02-01-17
DETAILS GUIDE
Table of Contents
Section 1
Introduction
Section 2: General Information
Unloading Procedure Purlin and Girt Punching Welding Recommendations
2.01 2.04 2.06
Section 3: Building Components
Sealants
3.01 3.02 3.07 3.08 3.11 3.12 3.13 3.14 3.16 4.01 4.02 4.04 4.06 4.08 4.11 4.14
Bolting Clips
Miscellaneous Components
Gable and Eave Trim
Corner and Opening Trim
Base Trim
Miscellaneous Trim Roof Extension Trim
Slide Door Trim
Section 4: Framing Details
Eave Strut
Purlins Bracing
Endwall Framing
Girts
Sag Angles
Rake and Corner Angle
Section 5: Special Framing Details
Framed Openings Boxed Headers
5.01 5.03 5.04 5.06
Brace Backs
Purlin Closures
REVISED 02-01-17
DETAILS GUIDE
Table of Contents (continued)
Section 6: CS/AP Wall Panel Details
CS Wall Panel AP Wall Panel
6.01 6.03 6.05 6.06 6.08 6.09 6.10 6.12
One Piece Base Angle
Overhead Doors and Windows – CS Panel
Walkdoors – CS Panel
Overhead Doors and Windows – AP Panel
Walkdoors – AP Panel
Louver Installation
Section 7: Roof Paneling Details
CS - Roof Panel
7.01 7.03 7.05 7.07 7.08
CS – Gable and Eave Trim CS – Light Transmitting Panels
Dektite Roof Jacks
Ridge Vents
REVISED 02-01-17
INTRODUCTION
CHIEF Buildings’ goal is to provide its Builders with the highest quality products available in the
Industry. All building components manufactured by CHIEF Buildings are guaranteed to be free from
defects in material and workmanship for five years from the date of shipment, providing these
components and accessories are prepared and erected in accordance with CHIEF specifications and
instructions. CHIEF also warrants all other building components and/or accessories which are sold or
delivered (not manufactured) by CHIEF Buildings to the extent of the warranty as given to CHIEF by
the manufacturer of each specific product. UNLESS OTHERWISE STATED, CHIEF INDUSTRIES
EXPRESSLY EXCLUDES WARRANTIES OF MERCHANTABILITY AND/OR IMPLIED FITNESS.
This Manual is intended to provide CHIEF Builders with some guidelines for the purpose of
familiarizing him with standard conditions. However, due to the versatility and complexity of CHIEF
building designs, individual situations may vary. Please refer to the erection drawings, installation
instructions, erection manuals and installation manuals sent with your project. The erection drawings
that are sent for your individual building project shall take precedence over any materials included in
this manual.
CHIEF Industries does not guarantee nor shall we be held liable for the quality of erection, nor
assume the responsibility for building defects that may be attributed to improper erection techniques or
the negligence of other parties. Due to continuing research and product development, CHIEF Buildings
reserves the right to at any time change the products and/or procedures as described in this manual.
CHIEF Building Systems are designed for versatility and quality, when erected in accordance
with plans and instructions they are superior in performance and value to any other system available
today. THANK YOU FOR CHOOSING CHIEF.
1.0
REVISED 02-01-17
Made with FlippingBook flipbook maker