STC MSC Roof Panel

STC-MSC Gable Lead End w Thermal Spacer and Nichiha Panel Not by Chief

1

SPECIAL GABLE TRIM (SPT-X) #12-14 X 1 1/4" (6" C.C. for CS PANEL) (12" C.C. for AP PANEL) RAKE ANGLE (A-20-B) RAKE SUPPORT (A-20-T)

TRI-BEAD TAPE SEALER 1/4-14 X 1 1/4" WT (12" C.C.) 1/4-14 X 1 1/4" SHOULDER (24" C.C.)* STC/MSC ROOF PANEL THERMAL SPACER (NOT BY CHIEF)

BL

(2) FASTENERS (NOT BY CHIEF)

SPECIAL PURCHASED (IF BY CHIEF)

GABLE TRIM SUPPORT (GTS) (10'-0" C.C.) GABLE EXPANSION TRIM (GET)

#12-14 X 1" PANCAKE HEAD (2 EACH PURLIN) PURLIN

FASTENERS (NOT BY CHIEF) (12" C.C.) SPECIAL PURCHASED (IF BY CHIEF)

WALL PANEL

** NOTE: CONNECTION OF NICHIHA PANELS (NOT BY CHIEF), TO WALL PANEL IS NOT BY CHIEF. * IT IS IMPORTANT THAT 1/4-14 X 1 1/4" SHOULDERS ARE INSTALLED THROUGH THE CENTER OF THE SLOTTED HOLES OF THE RAKE SUPPORT.

** _" NICHIHA PANEL (NOT BY CHIEF)

Made with FlippingBook flipbook maker