Composite Material, Rigid Board, R-Seal
STC-MSC Deck Rigid Roof-Wall Gable Height Change Lead
NOTES: * Field cut bottom of wall panels to match roof slope. provide air gap of 1/4" min. at bottom of panel to avoid corrosion. ** It is important that fasteners are installed through the center of the slotted holes of the rake support. *** Insulation is representative. Erector shall refer to insulation manufacturer’s installation information for further details/direction. The erector is responsible for providing the final solution for installation, air tightness, and performance of the liner insulation system. **** See Roof Deck Fastener Details for additional fastener spacing information.
INSIDE CLOSURE HEIGHT CHANGE TRIM TOP (GHMTF) TRI-BEAD TAPE SEALER
BL
*** ___" RIGID CONTINUOUS INSULATION (NOT BY CHIEF)
SIKA 511 CAULK IN LOCKFORM OF HEIGHT CHANGE TRIM TOP (BEFORE ASSEMBLING) (SEE INSET DETAIL) HEIGHT CHANGE TRIM BOTTOM (GHMBF) 1/4-14 X 1 1/4" WT (12" C.C.)
HEIGHT CHANGE ANGLE (PL-x) #12-14 X ____" * WALL PANEL
(6" C.C. for CS PANEL) (12" C.C. for AP PANEL)
STC/MSC ROOF PANEL RAKE SUPPORT (A-20-S)
* 1 4 "
PRE-GLUED THERMAL SPACER (NOT BY CHIEF)
DRAFTING NOTE: Include Corresponding Standard Details. - STC-MSC Height Change Isometric Details
2"
DECKING
INSULATION TO PANEL
RAKE SUPPORT (A-20-B) *1/4-14 X 1 1/4" SHOULDER (24" C.C.)
***___" RIGID CONTINUOUS INSULATION (NOT BY CHIEF)
1/4-14 X _____" W/O (EACH PURLIN) #12-14 X 1" PANCAKE HEAD (2 EACH PURLIN) **** ___ X ___ (2 EACH PURLIN)
PURLIN
SIKA 511 CAULK IN LOCKFORM OF HEIGHT CHANGE TRIM TOP (BEFORE ASSEMBLING)