MVF / MVP - Erection Manual
MVF/MVP M echanically S eamed V ertical Leg F lat M echanically S eamed V ertical Leg P encil-rib
®
ERECTION SEQUENCE
STEP 4 cont'd
1
FIRST PANEL Apply a piece of "Pig-tail" Tape Mastic from a 3/32” x 3/4” roll , lined up with the Double Bead Tape Mastic at the eave as shown. This will prevent water infiltration through the end of the seam.
PANEL
"PIG-TAIL" MASTIC (FROM 3/32" X 3/4" ROLL)
MARRY THE "PIG-TAIL" MASTIC INTO THE DOUBLE BEAD TAPE MASTIC
DOUBLE BEAD TAPE MASTIC
MVF/MVP-26
Version 2.0
SUBJECT TO CHANGE WITHOUT NOTICE
Made with FlippingBook - Online catalogs