MVF / MVP - Erection Manual

MVF/MVP M echanically S eamed V ertical Leg F lat M echanically S eamed V ertical Leg P encil-rib

®

SPECIAL ERECTION TECHNIQUES VENTED RIDGE w/Vent Material

1/4"-14 X 7/8" WT

ROOF CAP

3"

12"

9"

1/4"-14 X 7/8" WT (6" C.C.)

METAL VENT

DOUBLE BEAD TAPE MASTIC

DOUBLE BEAD TAPE MASTIC

VENT MATERIAL

OUTSIDE/RIDGE CLOSURE

MVF/MVP ROOF PANEL

1/4"-14 X 7/8" WT (7) PER PANEL

INSULATION

PANEL CLIP W/FASTENERS (SEE ROOF PANEL PLAN) PURLIN

CUT LINE

6"

CAULK ON THE INSIDE WITH SIKA-201

METAL VENT

2"

2"

2"

2"

6"

2 = SPACES AT 6"

1/4"-14 X 7/8" WT

OUTSIDE/RIDGE CLOSURE

METAL VENT FASTENER SPACING

NOTE: Extend metal vent material 6" past the gable trim. Field slit and bend back to fill area between vertical face of vent and the ridge flashing plug. Caulk where endcap is formed with SIKA-201.

Version 2.0

SUBJECT TO CHANGE WITHOUT NOTICE

MVF/MVP-57

Made with FlippingBook - Online catalogs