SEAMING INSTRUCTIONS
SEAMING OPERATION Hand seaming panels must be done in two steps.
Operating Handle
Hand seaming tool
Stationary Handle
“A”
STEP 1: Position the end of the hand seaming tool flush with the end of the roof panel.
24 inches
Eave or Ridge, End of Roof Panel
STEP 1
STEP 2: Hold the stationary blade solidly against the top of the seam. Make sure that the flat side of the crimper is on the panel rib shoulder and the crimper hook is under the female lip. Rotate the operating handle 90 degrees or until it stops to form the seam. This should be done three times which produces a finished 24” long seam.
Operating Handle
Stationary Handle
“B”
NOTE: At the first panel at the gable ends of the building the panel must be screwed to the panel clips. See the MVF/MVP installation manual and erection drawings for additional details.
STEP 2
Operating Handle
Operating Handle
Stationary Handle
The seam is now ready to accept the electric seamer.
Stationary Handle
CAUTION It is critical that the panel seams are crimped and folded as shown before using the electric seamer. Failure to follow these guidelines will result in damaged seams.