STC - Erection Manual
STC S nap T ight C onstruction
®
ERECTION SEQUENCE
FIELD FORMED PANEL TO FIT FINAL DIMENSION
STEP 13 cont'd
RAKE SUPPORT
6
3 2 5
4
1
LAST PANEL RUN (Optional)
Refer to Erection Drawings Details for Gable Detail to determine how your roof should end. If odd length building, Chief will detail in bend-up condition. Or, if detailed on module, but module is not met, optional "off module" condition can be installed by erector. See Rake Trim ending in off module detail with panel bend-up and termination trim in details section of this manual. Odd length buildings and variations in erection practices may dictate that an alternate detail be used. When terminating in an odd dimension, field cut and bend-up a 3" vertical leg on the panel. Refer to Suggested Tools in General Information section of this manual. After laying the last insulation run, install the field formed panel. Temporarily fasten the formed leg of the panel to the rake support with locking pliers.
1/4"-14 X 1 1/4" SHOULDER
6" TO 18"
FULL PANEL
PARTIAL PANEL (6" TO 18" SPACE PANEL MUST BE FIELD FORMED)
FIELD FORMED PANEL TO FIT FINAL DIMENSION
RAKE SUPPORT
1/4"-14 X 1 1/4" SHOULDER
18" TO 23"
18" MAX.
5"
The combination of field formed panel and Variable Termination Trim may be used to accommodate large dimensions as shown.
PARTIAL PANEL (18" TO 23" SPACE PANEL MUST BE FIELD FORMED)
CAUTION The roof should be swept clean of any drill shavings at the end of the day to prevent rust.
STC-36
Version 7.1
SUBJECT TO CHANGE WITHOUT NOTICE
Made with FlippingBook - Online catalogs