STC - Erection Manual
STC S nap T ight C onstruction
®
DETAILS
GABLE HEIGHT CHANGE TRIM
SL
SL
HEIGHT CHANGE ANGLE (A-20-H) #12-14 X 1 1/4"
**WALL PANEL
(6" C.C. for CS PANEL) (12" C.C. for AP PANEL)
HEIGHT CHANGE TOP TRIM (GHMTF)
INSIDE CLOSURE
HEIGHT CHANGE TRIM BOTTOM (GHMBF)
TRI-BEAD TAPE MASTIC
SIKA 511 SEALANT IN HEM OF TOP HEIGHT CHANGE TRIM (BEFORE ASSEMBLING)
*1/4"-14 X 1 1/4" SHOULDER (2'-0" C.C.) #12-14 X 1" PANCAKE HEAD (2 EACH PURLIN)
1/4"
1/4"-14 X 1 1/4" WT (12" C.C.)
STC PANEL
RAKE SUPPORT
2"
2"
ENDING HEIGHT CHANGE RAKE
BEGINNING HEIGHT CHANGE RAKE
SL
* It is important that 1/4"-14 X 1 1/4" SHOULDER fasteners are installed through the center of the slotted holes of the rake support. ** Field cut bottom of panels to match roof slope. Provide air gap of 1/4" minimum at bottom of panel to avoid corrosion. ***Trim Plug is field formed using Height Change Trim scrap. Apply sealant as required. Bend edge at steel line to marry trim with adjacent wall panel or corner trim.
SL
1/4"-14 X 7/8" WT
***HEIGHT CHANGE TRIM PLUG
(2) 1/4"-14 X 7/8" WT
2"
TRIM CAP (TCM)
HEIGHT CHANGE PLUG AT EAVE
ENDING HEIGHT CHANGE RAKE OFF MODULE
STC-54
Version 7.2
SUBJECT TO CHANGE WITHOUT NOTICE
Made with FlippingBook - Online catalogs