Eave Strut to Inset Col w 6-8 flange Joist and MVF-MVP Roof Trans Exp w Thermal Spacer

* FINGER TIGHTEN 1ST 1/2" DIA. NUT TO HARD WASHER, WRENCH TIGHTEN SECOND NUT TO FIRST NUT TO CREATE A SLIDING CONNECTION

1

1

** MAINTAIN 2 1/2" BETWEEN FIXED AND SLIDING EAVE STRUT DURING BUILDING ERECTION

FRAME COLUMN XBC-98

FRAME COLUMN

CL

4 1 2 " 1 1 4 "

BL

XBC-98

REF PT

XSHM-2

SLIDING EAVE STRUT

(4) 5/8" X 2 1/2" BOLTS w/ (4) 5/8" HARD WASHERS AT C-SECTION SIDE FIXED EAVE STRUT

1 1 4 "

1 1 2 " 4"

NOTE: CONNECTION OF XBC-98 TO SLIDING EAVE STRUT IS NOT SHOWN IN THIS SECTION

EAVE HEIGHT

EAVE HEIGHT

* (2) 1/2" X 1 3/4" BOLTS w/ (2) NUTS AND (1) 1/2" HARD WASHER AT EACH SLOT (BOLT MUST BE CENTERED IN SLOT)

FIXED EAVE STRUT

3 1 4 "

**2 1 2 "

SECTION

(4) 5/8" X 2 1/2" BOLTS w/ 5/8" HARD WASHERS AT C-SECTION SIDE