Special Features
Eave Strut to Inset Col w 10 flange Joist and MVF-MVP Roof Trans Exp w Thermal Spacer
* FINGER TIGHTEN 1ST 1/2" DIA. NUT TO HARD WASHER, WRENCH TIGHTEN SECOND NUT TO FIRST NUT TO CREATE A SLIDING CONNECTION
1
1
** MAINTAIN 3 1/2" BETWEEN FIXED AND SLIDING EAVE STRUT DURING BUILDING ERECTION
FRAME COLUMN XBC-99
FRAME COLUMN
CL
4 1 2 " 2 1 4 "
BL
XBC-99
REF PT
XSHM-2
SLIDING EAVE STRUT
(4) 5/8" X 2 1/2" BOLTS w/ (4) 5/8" HARD WASHERS AT C-SECTION SIDE FIXED EAVE STRUT
1 1 4 "
1 1 2 " 4"
NOTE: CONNECTION OF XBC-99 TO SLIDING EAVE STRUT IS NOT SHOWN IN THIS SECTION
EAVE HEIGHT
EAVE HEIGHT
* (2) 1/2" X 1 3/4" BOLTS w/ (2) NUTS AND (1) 1/2" HARD WASHER AT EACH SLOT (BOLT MUST BE CENTERED IN SLOT)
FIXED EAVE STRUT
**3 1 2 "
3 1 4 "
SECTION
(4) 5/8" X 2 1/2" BOLTS w/ 5/8" HARD WASHERS AT C-SECTION SIDE
Made with FlippingBook flipbook maker