Special Steel Framing
OSHA PLT TO SUPPORT COLUMN
MEZZANINE FLOOR DECKING
"NEAR OSHA COLUMN" JOIST REQUIRES BOLTED ENDS W/WASHERS. SEE PLAN VIEW FOR LOCATIONS AND BOLT REQUIREMENTS
1/4" 6" 1/4" 6"
MEZZANINE ELEVATION
NEAR OHSA COLUMN JOIST
SUPPORT COLUMN
3"
HOLD
JOIST CHORDS TO SET ASTRIDE STABILIZER CLIP NO WELDING IS PERMITTED STABILIZER PLATE (PL-x) PLATE MAY BE REMOVED AFTER ERECTION IS COMPLETED.
NEAR OSHA COLUMN JOIST FIELD WELDED STABILIZER PLATE REQUIRED. CLIP TO BE INSTALLED PRIOR TO ERECTING JOIST. Ø13/16" HOLE PROVIDED FOR ERECTION GUYING OR PLUMBING CABLES.