Special Steel Framing
OSHA PLT TO WF COLUMN
"NEAR OSHA COLUMN" JOIST REQUIRES BOLTED ENDS W/WASHERS. SEE PLAN VIEW FOR LOCATIONS AND BOLT REQUIREMENTS
MEZZANINE FLOOR DECKING
1/4" 6" 1/4" 6"
MEZZANINE ELEVATION
NEAR OHSA COLUMN JOIST
NEAR OHSA COLUMN JOIST
FLOOR BEAM
3"
JOIST CHORDS TO SET ASTRIDE STABILIZER CLIP NO WELDING IS PERMITTED
HOLD
STABILIZER PLATE (PL-x) MAY BE REQUIRED ON ONLY ONE SIDE. PLATE MAY BE REMOVED AFTER ERECTION IS COMPLETED.
SUPPORT COLUMN
BOLTS AND NUTS AS REQUIRED (SEE ERECTION DRAWINGS FOR QUANTITY AND SIZE)
NEAR OSHA COLUMN JOIST FIELD WELDED STABILIZER PLATE REQUIRED. CLIP TO BE INSTALLED PRIOR TO ERECTING JOIST. Ø13/16" HOLE PROVIDED FOR ERECTION GUYING OR PLUMBING CABLES.
Made with FlippingBook flipbook maker