Special Steel Framing
OSHA PLT TO WEB OF WF SUPPORT BEAM
MEZZANINE FLOOR DECKING
"NEAR OSHA COLUMN" JOIST REQUIRES BOLTED ENDS W/WASHERS. SEE PLAN VIEW FOR LOCATIONS AND BOLT REQUIREMENTS
1/4" 1/4"
6" 6"
MEZZANINE ELEVATION
NEAR OHSA COLUMN JOIST
NEAR OHSA COLUMN JOIST
3"
JOIST CHORDS TO SET ASTRIDE STABILIZER CLIP NO WELDING IS PERMITTED
HOLD
STABILIZER PLATE (PL-x) MAY BE REQUIRED ON ONLY ONE SIDE. PLATE MAY BE REMOVED AFTER ERECTION IS COMPLETED.
FLOOR BEAM
NEAR OSHA COLUMN JOIST FIELD WELDED STABILIZER PLATE REQUIRED. CLIP TO BE INSTALLED PRIOR TO ERECTING JOIST. Ø13/16" HOLE PROVIDED FOR ERECTION GUYING OR PLUMBING CABLES.