MVF / MVP - Erection Manual
MVF/MVP M echanically S eamed V ertical Leg F lat M echanically S eamed V ertical Leg P encil-rib
®
ERECTION SEQUENCE
THERMAL SPACER
STEP 3
THERMAL SPACER (FOR HIGH SYSTEM ONLY)
PURLIN
Position the Thermal Spacer on top of the insulation over each purlin prior to installing the roof panel. The eave strut does not receive a Thermal Spacer.
EAVE STRUT
INSULATION
THERMAL SPACER
DOUBLE FACED TAPE (6" LONG PIECES AT 3'-0" C.C.) (BY INSULATION SUPPLIER)
THERMAL SPACER
Version 2.0
SUBJECT TO CHANGE WITHOUT NOTICE
MVF/MVP-23
Made with FlippingBook - Online catalogs