MVF / MVP - Erection Manual

MVF/MVP M echanically S eamed V ertical Leg F lat M echanically S eamed V ertical Leg P encil-rib

®

ERECTION SEQUENCE

STEP 13 cont'd

6

3

5

2

4

1

OUTSIDE-RIDGE CLOSURE

After the Double Bead Tape Mastic is installed, install the outside/ridge closure up against the notch as shown.

OUTSIDE/RIDGE CLOSURE

1/4"-14 X 7/8" WT

DOUBLE BEAD TAPE MASTIC

Use 1/4”-14 x 7/8” WT fasteners installed in the sequence shown. Seven fasteners are required at this location, six in the flat and one through the vertical leg.

1/4"-14 X 7/8" WT

OUTSIDE/RIDGE CLOSURE

1

3

4

5

6

2

7

FASTENER SEQUENCE OUTSIDE/RIDGE CLOSURE

Version 2.0