ERECTION SEQUENCE
STEP 13 cont'd
6
3
5
OUTSIDE/RIDGE CLOSURE
2
4
1
OUTSIDE-RIDGE CLOSURE
Field cut a 3” strip of "Pig-tail" Double Bead Tape Mastic from a 3/16” x 7/8” roll and apply to the ridge closure. This will seal the next ridge closure to this one.
1/4"-14 X 7/8" WT
DOUBLE BEAD TAPE MASTIC
"PIG-TAIL" FROM DOUBLE BEAD TAPE MASTIC ROLL
Using the pre-punched hole in the ridge closure, install one 1/4”-14 x 7/8” WT fastener through the vertical leg.
FLATTEN END OF PANEL TO AVOID DAMAGE TO ROOF CAP
3"
Flatten the end of the panel to avoid damage to the roof cap.
Install all outside/ridge closures on both sides of the ridge.
Apply Double Bead Tape Mastic to the top of the ridge closure.
DOUBLE BEAD TAPE MASTIC