Special Steel Framing
OSHA PLT TO WEB OF WF SPPT BEAM ABOVE CLMN
MEZZANINE FLOOR DECKING
"NEAR OSHA COLUMN" JOIST REQUIRES BOLTED ENDS W/WASHERS. SEE PLAN VIEW FOR LOCATIONS AND BOLT REQUIREMENTS
1/4" 6" 1/4" 6"
MEZZANINE ELEVATION
JOIST CHORDS TO SET ASTRIDE STABILIZER CLIP NO WELDING IS PERMITTED NEAR OHSA COLUMN JOIST FLOOR BEAM
NEAR OHSA COLUMN JOIST
3"
HOLD
STABILIZER PLATE (PL-x) MAY BE REQUIRED ON ONLY ONE SIDE. PLATE MAY BE REMOVED AFTER ERECTION IS COMPLETED.
SUPPORT COLUMN PIPE, OR TUBE
BOLTS AND NUTS AS REQUIRED (SEE ERECTION DRAWINGS FOR QUANTITY AND SIZE)
NEAR OSHA COLUMN JOIST FIELD WELDED STABILIZER PLATE REQUIRED. CLIP TO BE INSTALLED PRIOR TO ERECTING JOIST. Ø13/16" HOLE PROVIDED FOR ERECTION GUYING OR PLUMBING CABLES.